Kent Street Telephone Exchange
Diesel generator replacements in the basement. This job included 16 stories of exhaust, silencing and ducting fans running the full height of the building. A helicopter was used to do the final lift.
Diesel generator replacements in the basement. This job included 16 stories of exhaust, silencing and ducting fans running the full height of the building. A helicopter was used to do the final lift.
Canberra Playhouse
Number One Engineering manufactured and installed acoustic doors to all external entrances and exits.
Number One Engineering manufactured and installed acoustic doors to all external entrances and exits.
Gouburn Police Academy
The training centre at Goulburn Police Acadmeny was equipped with viewing platforms and jailcell doors used in training simulations.
The training centre at Goulburn Police Acadmeny was equipped with viewing platforms and jailcell doors used in training simulations.